Inside the Roundhouse on Saturday, a number of our volunteers worked on a variety of metal working projects including the miniature switch destined for the north end of the station platform ( as shown in the pictures above). We stayed with this work until after six p.m. But when we left for the day, we were rewarded by our test trucks of both gauges running through the switch in both directions successfully.
.
In the picture at the right below, we find Elwell the Crane in service moving the maintenance platform to a more appropriate location. In the two pictures at the lower left below, we find one of our crews doing maintenance on our wheeled scaffolding platform.
.
Posting by Russ Milland; Pictures by Michael Guy, James Rasor & Stephen Gardiner
.