Uncategorized

Weekend Report: Final Miniature Railway Switch in Place!

Click on each image for a closer look!
.
We had yet another successful work team effort this past weekend. The last and final track switch was installed on the miniature railway. Some adjustments were made to one of the curves in the miniature railway track to ease up on the radius of the curve. Work continued on the restoration of the TH&B caboose. In the pictures accompanying this news posting we also see that the switch lever frames are now in their proper position in Cabin D.
.
Posting by Russ Milland; Pictures by Stephen Gardiner
.

http://www.trha.ca