Uncategorized

Removing the Switch Lever Assembly from Cabin D

Click on each pictures for a closer look!
.
As noted in earlier news items, Tom Murison is charged with restoring Cabin D. Tom hired McCulloch Moving, the firm that moved #6213, to to lift the lever frame out of Cabin D. In the photo at the left above, we see the lever frame assembly being lifted out. In the other two pictures, we see the frame being offloaded at the offsite location where the frames will be restored. Cabin D restoration will be completed after the mechanism is replaced as the entire west end of the building had to be removed to provide a “door” through which to remove the frame.
.
Posting by Russ Milland; Pictures by Tom Murison

http://www.trha.ca