Mid-week Progress on Switch Installation!
Click on each image for a closer look!
.
Thursday afternoon was another productive effort by a TRHA team who spent the afternoon building track. By the time we finished about six o'clock, the second switch at the platform crossover/wye exit location was in place and 2/3 connected. The south wye switch at the depot lead track now has its frog point installed and point blades in place but not finally fitted.
.
It was a good productive afternoon and gives us a head start for the weekend. We are now down to only one more switch and a "mess" of crossing flangeways to complete before the main loop can see its first test train.
.
Posting by Michael Guy; Pictures by Lance Gleich
.