The view shown in the picture at the left above through the door from the machine shop to stall 25 will disappear very shortly when the opening is bricked up. In the middle picture, we see the steel reinforcing mesh laid over the plastic ready for the concrete floor to be poured in stalls 18 to 23. In the picture at right, we find a remaining relic of the old days - the gate to a steel pipe storage rack.
.
Story and Pictures by Michael Guy
.
The view shown in the picture at the left above through the door from the machine shop to stall 25 will disappear very shortly when the opening is bricked up. In the middle picture, we see the steel reinforcing mesh laid over the plastic ready for the concrete floor to be poured in stalls 18 to 23. In the picture at right, we find a remaining relic of the old days - the gate to a steel pipe storage rack.
.
Story and Pictures by Michael Guy